MobileTDU-1 Compact
Super-compact and self-contained unit with diesel burner for exploratory and field drilling. The unit can be installed and started within 24 hours. Maximum capacity of the unit is 1 ton of drill cuttings per hour.
MobileTDU-5 Induction
The unit is designed to fit into standard 20-foot shipping containers. Installation and startup can be completed within
24-72 hours.
MobileTDU-0,5 Induction Compact
Treatment of up to 5 tons per hour.
The unit can be started within 72 hours.
MobileTDU-3
Self-contained unit with diesel burner for cluster drilling and treatment of large cuttings pits of long-term storage. Maximum capacity of the unit is 3 tons of drill cuttings per hour.
MobileTDU-3 Universal
Universal solution for operation at oil fields and disposal sites. The unit can operate using any liquid and gas fuel. Maximum capacity of the unit is 3 tons of drill cuttings per hour.